ASSEMBLING THE STRUCTURE

The foundation part of the structure is placed within the foundation excavation, it is centred and fixed, and then the concrete is cast in the foundations. Further assembly is made after the concrete solidifies. The structure can be mounted element by element (one element at the time), in parts (sections) or in one piece (complete).

Sections of the towers are composed of main legs of max. length 6m connected with diagonals, and the same section is used for towers of different heights without requiring additional works on the structure as such. In this way the storage (number of positions) and assembly of towers is simplified. It makes possible to very simply use them on different locations in case the existing tower is to be disassembled, as also makes possible to use then for lower heights, that is the foundation section can be used for both equal and for higher towers.Assembling the structure